THE RIGHT BASE
FOR CRITICAL EQUIPMENT.
Stable, level concrete support pads for commercial generators, HVAC units, chillers and industrial equipment. Footprint, loading and site conditions determine the finished application.

PRECISION
WHERE IT
COUNTS.
Every equipment installation starts with a stable, appropriately located support surface. Pad dimensions, imposed loads, anchorage and construction requirements must align with equipment specifications and any applicable project drawings.
London Commercial Concrete focuses on commercial-site applications. Final specifications—including slab thickness, reinforcement, concrete mix and joint design—depend on the job requirements and any applicable engineered plans.
THOUGHT THROUGH.
BEFORE THE POUR.
Requirements and site conditions drive the planning process.
Equipment footprint
Allow for actual dimensions, service clearances and installed equipment layout.
Loads & interfaces
Coordinate load, vibration, anchorage and utility-interface requirements with applicable project specifications.
Site integration
Plan pad placement relative to access, drainage and surrounding building or yard construction.
BUILT FOR
THE SITE.
- Ground-mounted HVAC and chiller unit supports
- Generator and industrial equipment bases
- Concrete pads for new commercial mechanical installations
- Replacement or additional pads during facility upgrades
START WITH
THE BASICS.
- What equipment will the pad support?
- Can you provide the unit specifications or drawings?
- What are the required pad location, elevation and dimensions?
- Are there anchorage, vibration or access requirements to coordinate?